Armitage Construction were enlisted to undertake the replacement air conditioning to the main gymnasium and replacement lighting to the sports hall.
The replacement lighting was sought after to provide a venue that would meet Sport England’s criteria for artificially lit facilitates and afford Manchester an opportunity to potentially host future competition and events. To achieve the above, Armitage introduced secondary steel supports to the existing steel frame and replaced the court lighting with new high performance LED luminaires. The equipment had to be carefully managed into position by hand, gaining access via a mobile elevated work platform whilst dutifully remaining mindful to the weight-limitations conditioned by the gymnasium sports floor.
The programme duration was initially six weeks. However, on this particular occasion we were able to finish ahead of the programme and offer back the facilities a week prior to planned completion.
We have considerable experience of working within the Education sector. The projects we have previously completed range from classroom extensions to general refurbishment of School buildings.
"We have always found the company to be extremely proactive with strong leadership and a skilled labour workforce"
Thomas Worthington Design
"I recommend this company highly and would be glad to discuss their work if required"
St Hilda's Church
"The Manager on site was always courteous and considerate of the care environment that they were working in. Daniel was always helpful and interested in the standard of work being undertaken and took a personal interest in the project."
Care Concepts LTD
"Thank you again for the cooperation, effort and skill of your team in delivering the Chemotherapy Unit ahead of programme. This has been much appreciated by the Estate Department at Stepping Hill"
Stepping Hill Hospital
"Armitage Construction carried out the alteration works to a high standard and the Parish and I remain delighted with their work, team and organisation"
Gramham Holland Assocaites
"The Armitage team managed the delivering of the project within budget and programme restrictions, whilst providing the desired quality. The helpful nature and resourcefulness they exhibited helped to overcome numerous complications."
Halliday Meecham
"Without question this goes to the wider team and more so to Armitage Construction for their delivery, patience and communications. Without the levels of persistence you showed, it could have proved a little more difficult."
University of Manchester
"I wish to record my appreciation of the contractor's efforts to regain some of the delay recorded and on the quality of the end product. The work was of the highest order and the south side of the church now looks in very good order."
Lloyd Evans Prichard
"We have found that attitude to the project from all members of the contractors team, from Site Foreman, Site Managers, Project Manager, Contracts Manager and Managing Surveyor, to be most refreshing in these days of construction activity."
FDG
"Armitage are a thoroughly good contractor, and I recommend them highly"
University of Manchester
"We are delighted to have employed Armitage Construction as the Main Contractor on the building of our new Medical Centre. They have displayed a very professional, organised and helpful approach."
Heaton Moor Medical Centre
"The management of the site from a client perspective has been very good, this is a great reflection on Steve."
National Trust – Quarry Bank Mill